SGL-10 engineering drilling rig
The sgl-10 drilling rig is a combination of crawler chassis on the basis of the original sg-18 project construction rig of wuxi exploration machinery general plant of jiangsu province.
Category:
Exploration Drilling Rig
Description
The sgl-10 drilling rig is a combination of crawler chassis on the basis of the original sg-18 project construction rig of wuxi exploration machinery general plant of jiangsu province.
Main features:
In addition to the performance of the original drilling rig, the rig is designed with a new hydraulic system according to the requirements of the customer, and the new hydraulic system is designed.Hydraulic control shift, tower and other work.The operation is convenient and flexible, which greatly improves the working efficiency and meets the needs of customers.When the drill is working, the mud is used as the washing fluid (positive circulation), and the rotary table turns to drive the drilling tool.The system is used to realize decompression drilling, lifting and lifting drilling tools, downhole pipe, impact sampling, etc.The drilling machine is equipped with fine tuning drilling mechanism and machinery to unscrew the drill equipment.
Scope of application:
1. Hydrogeological conditions of exploration and reconnaissance strata;
2. Drilling Wells for agricultural irrigation and industrial use;
3. Drilling holes for underground tunnel ventilation and bridge foundation piles.
Technical parameters:
Drilling depth
300 m
Borehole diameter
500 mm
Drill pipe
Take the initiative to drill pipe
108 * 108 * 8000 mm
Hole drill pipe
Ø 89 * 6500 mm
Rotary table
The hole diameter
500 mm
Speed (positive and reverse)
40, 70, 128r/min.
The weight of the
660 kg
The main hoist
Lifting capacity (single rope first speed)
30 kn
Single rope hoisting speed.
0.65, 1.16;2.08 m/s
Drum diameter
330 mm
Wire rope specification.
Ø 20-6 * 19 + 1
Wire rope capacity.
120 m
Vice winch
Lifting capacity (first speed)
20 kn
speed
0.46, 0.80, 1.44 m/s
Drum diameter
170 mm
Wire rope specification.
Ø 14-6 * 19 + 1
Wire rope capacity.
330 m
rig
Derrick structure
portal
The vertical height
9.5 m
Caterpillar chassis
Chassis height: 850mm.
Track speed: 7.7m/min.
Outline dimensions for rig installation (length * width * height mm)
Transportation status: 9450**2250*2850.
Construction status: 5200*3390*10000.
The total drilling rig
11500 kg
Related products
Message